For one air conditioning installer in London

Own londonairconinstaller.co.uk and this website

  • The domain londonairconinstaller.co.uk
  • A search report: what people in London type for this trade each month
  • This website, with your own job photos in place of ours
  • Your Google Business Profile set up
  • 2 weeks of Google Ads management free (you only pay Google for the clicks)

Message Matthew at BetterWays, who own the domain.

See the search report for London

Office and commercial

Server room and comms cupboard air conditioning

Last updated 23 October 2026 · 4 minute read

Short answer: A server room or comms cupboard needs its own air conditioning, separate from the office system, because the equipment makes heat all day, every day, including winter weekends when office cooling is off. Size it for the equipment's heat output with room to grow, choose a unit rated for year round cooling, and plan for a fault.

Modern open plan office with a ceiling cassette air conditioning unit above the desks

Why comms rooms are different

A London office might need cooling from May to September, during working hours. A server room or comms cupboard needs it every hour of every day. Network switches, servers, storage and power supplies turn almost all the electricity they use into heat, and they do it constantly. In a small, closed cupboard that heat builds fast.

The usual problems are:

  • the comms cupboard sharing the office system, which switches off at 7pm
  • a unit that heats in winter because the office system is set to heat
  • a cupboard with no cooling at all, just a door left open
  • a unit sized years ago, before more equipment was added

Sizing it properly

Equipment heat output is the starting point. As a rule of thumb, the heat given off is close to the electrical power the equipment draws. Add to that:

  • lighting
  • any people working in the room
  • heat gain through walls, especially an outside wall or a wall next to a kitchen
  • sun on any windows

Then allow room for growth. Comms rooms rarely get smaller.

FactorWhy it matters
Equipment power drawthe main heat source, running all the time
Room size and wallssmall rooms heat up faster
Outside walls or windowsadd heat in summer
Future equipmentavoid undersizing in two years
Target temperaturefollow the equipment makers’ guidance

Choosing a unit for year round cooling

Home split systems are designed mostly for summer cooling. A comms room needs cooling in January too, when the outdoor temperature is low. Not every unit is happy cooling when it is cold outside. Choose a unit the manufacturer rates for low ambient cooling, so it keeps working through a London winter.

Other features worth having:

  • auto restart after a power cut, so cooling resumes without anyone pressing a button
  • a high temperature alarm or a link to your building management or monitoring system
  • dedicated controls that office staff cannot change by accident

Resilience

If a business depends on its comms room, a single unit is a single point of failure. Common approaches are:

  • two units with a controller that runs one as duty and one as standby, swapping over regularly
  • a temperature alarm that alerts someone if the room gets too warm
  • a service plan with visits more frequent than for office cooling, since the unit runs constantly

Condensate and leaks

A unit running all year makes condensate for much of it. Water and IT equipment do not mix, so the condensate route matters more here than anywhere. Avoid mounting the indoor unit directly above racks if you can. If the drain relies on a pump, consider a pump with an alarm or a cut out that stops the unit if water backs up. Our guide to air conditioning leaking water explains the common causes.

Landlord and building rules

In the City of London, most offices are let floor by floor, and the outdoor unit for a comms room usually has to go on a roof plant deck, a terrace or a designated plant area controlled by the landlord. Expect to need a licence for alterations and the landlord’s agreement on the outdoor unit location, pipe routes through risers and the condensate connection. Some buildings provide a dedicated cooling supply for tenant comms rooms, which can be simpler. Our City of London page explains how City buildings handle this.

New outdoor plant on commercial property normally needs planning permission, because the heat pump permitted development rules apply to homes only (Planning Portal).

The refrigerant work must be done by an engineer with an F-gas qualification, working for a company certified by an approved body listed on gov.uk. If the comms room units and the office system together exceed 12kW, the building needs a TM44 inspection at least every five years, explained in our TM44 guide. Larger systems may also need F-gas leak checks.

Getting it right

The steps are straightforward: measure the load, choose a unit built for constant cooling, plan the drain, add an alarm and keep it serviced. Our office air conditioning page explains how a commercial survey and install run.

Questions to ask before you install

Before choosing a system for a comms room, it helps to answer:

QuestionWhy it matters
What is the total power draw of the equipment?sets the cooling load
Will more equipment be added in the next few years?avoids undersizing
Is there an outside wall or window?adds heat in summer
Where can the outdoor unit go, and who controls that space?landlord consent and planning
Where will condensate drain?water near IT equipment is a risk
Who gets alerted if the room overheats?a fault at the weekend can go unnoticed
Is a standby unit justified?depends on what the business can tolerate

The answers shape the design and the quote, and they are what the landlord’s engineer will want to see too.

Quick questions

Can I use the office air conditioning for the server room?

It is not a good idea. Office systems are often switched off at night and weekends, and in winter they may be heating. A comms room needs cooling all the time, so it should have its own unit.

How do I size air conditioning for a server room?

Start with the heat output of the equipment, which is close to the electrical power it uses, then add heat from lighting, people and any sun on walls or windows. Allow headroom for more equipment later.

What happens if the server room air conditioning fails?

Temperatures can rise quickly in a small room. Many businesses add a second unit or a high temperature alarm so a fault is noticed and covered.

The serviceOffice and commercial in London Local notesAir conditioning installer in City of London

Last updated 23 October 2026. Written for homes in London. Rules can change, so check the linked sources for the latest position.